Most moisture problems in a wood floor start below it. Water vapor moves up from a concrete slab, out of a damp crawl space or out of a subfloor that got wet during construction, and the underside of the boards takes it on before the top does. The result is cupping, gaps or a failed bond, even though the boards left the factory at the right moisture content. A vapor retarder or moisture barrier is the layer meant to slow that movement. This article explains the terms, where the layer goes for each installation method, the common types, and who decides which one is used.
The terms, briefly
The words are often used loosely, and it helps to separate them.
- Vapor retarder. A material that slows the passage of water vapor. Building codes classify retarders by how much vapor they let through, a property called permeance.
- Vapor barrier. Commonly used for a retarder at the low-permeance end of the scale, such as polyethylene sheet. In flooring conversation, “barrier” and “retarder” are often used for the same thing.
- Moisture control system. The term adhesive makers tend to use for a membrane, primer or adhesive designed to limit the effect of slab moisture on a glued floor.
- Slip sheet. A paper laid under a nailed floor to reduce friction and noise. Some papers also retard vapor; plain building paper may not. The installer should know which is which.
None of these replaces testing. A retarder controls moisture that the testing shows is within the range its maker accepts. It is not a fix for a slab or subfloor that is too wet.
Where moisture comes from
| Source | Typical path | Who controls it |
|---|---|---|
| Ground under a slab on grade | Up through the slab | Building designer (layer under the slab), then installer |
| New concrete | Drying out of the slab itself | Construction schedule, then installer |
| Crawl space | Up into the joists and subfloor | Building designer, crawl space ground cover and ventilation or conditioning |
| Wet subfloor panels | Directly into the boards above | Builder and installer |
| Indoor air | Into the top face | HVAC running before and after installation |
Notice that several of these are building questions, not flooring questions. A layer under the slab or a ground cover in a crawl space is part of the building, drawn by the architect or engineer. The flooring layer sits on top of that work and cannot make up for its absence.
By installation method
Nail-down over a wood subfloor
Over plywood or OSB, the installer usually lays an underlayment paper or felt before the boards, then nails through it. Depending on the product, this layer retards vapor from below, reduces friction and helps with small squeaks.
The choice of paper is not simply “the less permeable, the better”. A very impermeable sheet on a wood subfloor can trap moisture in the subfloor in some climates and building types. The installer chooses the product following installation guidance for the climate, and the building designer’s approach to the crawl space or the floor below.
Glue-down over concrete
On a glued floor there is no separate sheet between the board and the slab, because the board has to bond to something. Moisture control is part of the adhesive system instead:
- Liquid-applied membranes rolled or troweled onto the slab before the adhesive.
- Primers that seal the slab surface and improve the bond.
- Adhesives with built-in moisture control, usually polyurethane or similar, applied at the coverage their maker states.
These products are designed to work together. The adhesive maker states which membrane goes with which adhesive, which test method applies to the slab and what result is acceptable. Mixing products from different systems leaves the installer without the maker’s support. Standard tests include ASTM F2170 and ASTM F1869; our article on concrete moisture testing explains how they are used.
Floating over concrete
A floating floor rests on an underlay. Over concrete, a polyethylene film is normally laid below or as part of the underlay, with seams overlapped and taped and the edges turned up at the walls. Some underlays come with the film already attached. Over a wood subfloor, the installer decides whether a film is appropriate, for the reason given above. Our article on underlayment for floating engineered oak covers the underlay itself.
Wood subfloor over concrete
Where plywood is fixed over a slab to allow nail-down, the vapor control layer goes on the slab, under the plywood, so the wood subfloor is protected as well as the floor.
The main types
| Type | Used with | What to confirm |
|---|---|---|
| Polyethylene film | Floating over concrete; under plywood on a slab | Seams overlapped and taped, edges turned up |
| Asphalt-saturated felt or paper | Nail-down over a wood subfloor | Product suited to the climate and subfloor |
| Building or rosin paper | Nail-down, as a slip sheet | Whether it retards vapor at all |
| Liquid-applied membrane | Glue-down over concrete | Same system as the adhesive |
| Adhesive with moisture control | Glue-down over concrete | Coverage and slab conditions per maker |
| Underlay with attached film | Floating | Film side down, seams sealed |
Who specifies what
| Decision | Who makes it |
|---|---|
| Vapor retarder under the slab, crawl space ground cover | Architect or building engineer |
| Whether the slab or subfloor is ready | Installer, by testing |
| Which membrane, primer or adhesive system | Adhesive maker, applied by the installer |
| Which paper or film on the subfloor | Installer, following installation guidance |
| Board moisture content at dispatch | Factory |
The NWFA publishes installation guidance that installers reference for these layers on each subfloor type.
The factory’s part is the board. At Vu Uy Wood, lumber is kiln-dried and checked against the moisture target for the order, and moisture is checked again before packing. Boards leave in cartons wrapped on pallets, and should stay in them until the site conditions are right. The Production page shows where these checks sit in the route.
Radiant heating
A heated slab adds its own rules. The heating system maker and the adhesive maker both have requirements about the slab, the moisture control layer and how the heat is brought up. Follow both. See engineered oak flooring over radiant heating.
Common mistakes
- Using a retarder in place of testing the slab.
- Combining a membrane from one maker with an adhesive from another.
- Leaving film seams untaped or stopping the film short of the walls.
- Laying a very impermeable sheet on a wood subfloor without considering the climate.
- Installing before the building is closed in and the HVAC is running.
What to put in the specification
- The subfloor and installation method in each area
- The moisture control approach chosen by the installer and adhesive maker
- The test method used, and who records the result
- Whether radiant heating is present
Working with Vu Uy Wood
Vu Uy Wood manufactures made-to-order solid and engineered French White Oak flooring in Song Than 3 Industrial Park, Ho Chi Minh City, and has done so since 2006. Our Tongue & Groove profile is intended for glue-down or nail-down installation, and moisture is checked at drying and before packing. Tell us the subfloor and method with your selections on the Specify page. We normally reply within one working day.