Sourcing & Compliance

Flooring Transit Damage: What to Record on Delivery

Flooring transit damage: what to record when the container is opened, carton and pallet checks, delivery notes, insurer and Incoterm roles, and the claim file.

Vu Uy Wood · November 27, 2026
All buyer guides

Between the factory dock and the warehouse floor, a flooring shipment passes through trucks, terminals, cranes and forklifts. Most containers arrive as they left. When one does not, whether the loss is recovered usually depends less on the damage itself than on what was recorded at the moment of delivery. A crushed carton noted on the delivery receipt and photographed in place is a claim. The same carton found a week later with no record is often just a loss. This article sets out what to record when a flooring container arrives, who is involved in a claim, and what to keep on file. It is practical guidance, not legal or insurance advice: your insurance policy and the carrier’s terms set the actual rules and time limits.

Who carries the risk, and who claims

The trade term decides where risk of loss or damage passes from seller to buyer. It does not decide how a claim is made; that is set by the insurance policy and the contract of carriage.

TermWhere risk passes to the buyerWho usually arranges cargo insurance
EXWAt the seller’s premisesBuyer
FOBWhen goods are on board the vessel at the port of loadingBuyer
CIF / CIPAt origin, although the seller buys the insuranceSeller arranges, buyer usually claims
DAPAt the named destinationSeller, up to that point

On the terms most flooring importers use, transit damage at sea or on the road at destination sits with the buyer, which is why the buyer’s own records matter most. The detail of each term is in our article on EXW vs FOB for hardwood flooring, and the quotation should state the term and named place, as covered in what a written flooring quotation should include.

Before the container arrives

Prepare the papers and the people before the truck backs in:

Tell the receiving warehouse that the goods are wood flooring, so pallets are stored under cover and off the ground.

Opening the container

Record the container before anything moves. In order:

  1. Photograph the container number, so every later photo can be matched to it.
  2. Check the seal number against the bill of lading and photograph the seal intact before it is cut.
  3. Photograph the outside: doors, roof and walls, looking for dents, holes or rust.
  4. Open the doors and photograph the load face before any pallet is touched.
  5. Look for water: a wet container floor, drips or staining from the roof, damp cartons, a musty smell.
  6. Photograph each tier as it comes out, especially shifted pallets, broken wrapping and leaning stacks.

A short video of the doors opening and the first view inside is useful, because it shows the load as it traveled.

Carton and pallet checks

Count pallets and cartons against the packing list, and check each label for SKU, color and lot. Then look at condition.

What you seeWhat to recordWhat not to do
Crushed or torn cartonsPallet number, carton count, photos close and wideThrow away the carton
Wet or stained cartonsLocation in the container, extent, photosRestack wet cartons with dry ones
Broken or loose wrappingPallet number, whether cartons shiftedRewrap before photographing
Forklift puncturesPallet number, depth, cartons affectedOpen and use the boards
Count short or overSKU and lot, against the packing listSign as complete

Set damaged cartons aside, unopened if possible. Then open a few to see what happened inside: broken tongues and grooves, dented faces, scratched finish, or boards that are damp to the touch. Photograph the boards beside their carton label, so each image shows the lot number.

Writing exceptions on the delivery receipt

The delivery receipt is the first written record that something was wrong on arrival. Write exceptions on it before signing, and be specific:

A general word such as “damaged” says little. A clean signature with no notes can make a later claim harder. If time does not allow a full check before the driver leaves, note that the goods were received without full inspection. Keep a copy of the signed receipt with the driver’s name and time.

Damage found later, when cartons are opened, is called concealed damage. Report it as soon as it is found, with the same kind of record. Notice periods are set by the policy and the carrier, so check them in advance rather than after the event.

Who to notify

Keep the damaged goods and their packing until the insurer or surveyor releases them. Move undamaged cartons away from wet ones, store everything dry and flat, and do not install damaged boards while the claim is open.

The claim file

RecordSource
Bill of lading, container and seal numberCarrier or forwarder
Packing list and commercial invoiceSupplier
Insurance certificateSeller or buyer, depending on the term
Loading photosSupplier, if agreed
Arrival photos and videoYour receiving team
Signed delivery receipt with exceptionsYour receiving team
Notes per pallet and carton, with lot numbersYour receiving team
Notices sent and replies receivedAll parties
Survey reportInsurer’s surveyor
Replacement quotationSupplier

Replacement and color

Replacement boards need to match the floor already delivered. Lot numbers on each carton label identify which production lot was damaged, and the approved sample remains the color master. We retain the approved panel as the master reference for repeat production, so replacement material is checked against the same standard. Our guide to hardwood flooring export packing explains why lot numbers belong on every label.

The record before loading

The condition of the goods at loading is the baseline for any claim. A pre-shipment inspection with photos of cartons, labels and the loaded container shows what left the factory. With that record at origin and a careful record at arrival, the gap between the two is where the damage happened.

Working with Vu Uy Wood

Vu Uy Wood manufactures solid and engineered French White Oak flooring to buyer specification in Song Than 3 Industrial Park, Ho Chi Minh City, and has done so since 2006. Our order process ends with packing and shipping: carton count, labeling and pallet build, then the container. When you request a quotation through the contact page, state your trade term and destination, and tell us what loading records you want. We normally reply within one working day.

More in Sourcing & Compliance

Related guides

Your project

Build the floor around your specification

Construction, format, width, grade, color, texture and finish are set per order. Work through the options, or send us the floor you are trying to match.

WhatsApp Request a quote