Sourcing & Compliance

Hardwood Flooring Export Packing: Cartons, Labels and Pallets

What to specify for hardwood flooring export packing: carton contents, label fields, private-label printing, pallet build and moisture protection in transit.

Vu Uy Wood · October 5, 2026
All buyer guides

A flooring order can be made exactly to the approved sample and still arrive as a problem: cartons crushed at the corners, labels that do not match the packing list, two production lots mixed on one pallet, or boards that took on moisture on the way. Packing is the last step in the factory and the first thing the warehouse, the installer and the customs broker see. This article sets out what to specify for cartons, labels and pallets on an export flooring order, and what to agree in writing before production starts.

Why packing belongs in the specification

Packing is often left to the end of the conversation, after color and price are settled. That is late, for three reasons:

The carton

The carton does three jobs: it keeps the boards together as a sales unit, protects the face and the profile, and carries the information that identifies what is inside.

Points to agree:

  1. Contents per carton. State whether cartons should be packed to a coverage in sq ft or to a board count, and whether random lengths are mixed within a carton. The exact carton content for your build is confirmed in the quotation.
  2. One SKU per carton. Each carton should hold a single product: one construction, width, grade, color, texture and sheen. Mixed cartons make counting and installation harder.
  3. Face and profile protection. Tongues and grooves are the most easily damaged part of a board in handling. Ask how boards are oriented in the carton and how ends are protected.
  4. Herringbone and chevron. For herringbone, left and right blocks must arrive in matching quantities. At Vu Uy Wood, herringbone is packed as left and right pairs so both hands travel together. Our herringbone specification guide explains why an imbalance stops the job.
  5. Sealing. Cartons should stay sealed until the installer opens them, which also helps keep moisture out.

The carton label

At Vu Uy Wood, carton labels identify the SKU and the production lot for traceability. Beyond that, the label is whatever your market and your distribution need. A practical label field list:

FieldWhy it is needed
Product descriptionConstruction, species and format, readable at a glance
Your SKU codeLinks the carton to your catalog and pricing
Color code and nameLibrary code, for example VU-NR-019 Natural Oak, or your own color name
DimensionsThickness, width and length, imperial first with metric in parentheses
Grade, texture and sheenLets the installer and the showroom check what they have
Production lotKeeps lots together on site and traces any question back to production
Coverage per cartonFor stock control and ordering
BarcodeIf your distribution requires it
Compliance statementFor example a CARB Phase 2 statement for engineered products entering the U.S. market
Carton numberAllows the carton count to be checked against the packing list

Send the label layout as a file, with every field named, and ask for a photo of a printed label on a real carton before the run is packed. Wording for compliance statements should follow the certification that applies to your product; our article on CARB P2, JAS and NWFA covers what to request.

Private-label cartons

For an OEM or private-label program, the carton carries your brand, not the factory’s. Agree in writing:

Our guide to OEM and private-label flooring programs covers the rest of the program setup.

Keeping production lots together

Oak is a natural material, and even within an approved range two lots can differ slightly. On site, the installer should work from one lot per room wherever possible. Packing can make that easy or hard:

This matters most for projects delivered in stages and for private-label programs where new stock meets old stock in the same warehouse.

The pallet

Once cartons are packed, they are built onto pallets and wrapped. Points to agree:

Moisture protection in transit

Wood flooring is dried and checked for moisture before machining so that it stays stable after installation. Packing and transport should not undo that work. General points that apply to any export flooring order:

Acclimation before installation is set by the installer, based on the site, the subfloor and the installation method. The installer, not the carton, decides when boards are ready to lay. For the reasons moisture control starts in the factory, see moisture control in flooring production.

What to agree before production

ItemAgreed in writing
Carton contentCoverage or board count per carton, confirmed in the quotation
Carton typePrinted, labeled, or plain with label
Label layoutFile with every field named
Artwork approvalWho approves the printed proof, and when
Lot controlOne lot per pallet where possible, lot on every label
Pallet buildStacking, protection, wrapping, pallet label
Wood packagingDestination requirement confirmed with forwarder
DocumentsPacking list by pallet, carton and lot

Working with Vu Uy Wood

Vu Uy Wood manufactures solid and engineered French White Oak flooring to order in Song Than 3 Industrial Park, Ho Chi Minh City, and has done so since 2006. Boards are packed into cartons, palletized and wrapped, with carton labels identifying the SKU and production lot, and carton count, labeling and pallet build are checked as the last of our quality checkpoints. You can see the full route on our production page, and send your carton and label requirements with your inquiry through the contact page. We normally reply within one working day.

More in Sourcing & Compliance

Related guides

Your project

Build the floor around your specification

Construction, format, width, grade, color, texture and finish are set per order. Work through the options, or send us the floor you are trying to match.

WhatsApp Request a quote